Title: Application for Water Supply Installation

Basis: Beijing Urban Public Water Supply Administrative Measures

Eligible Applicant: users within the water supply range of 8 urban districts operated by Beijing Water Supply Group

Condition: Materials submitted are in compliance with relevant provisions.

Material to be submitted:
1. Two 1/2000 topographic maps (construction scope shall be underlined with red pen);
2. One stamped drawing of the land approved to use (provided that there is no newly-approved land, plan sketch stamped by Beijing Municipal Commission of Urban Planning can be used as replacement);
3. One plan sketch;
4. Construction Project Planning Permit (Copy) or Property Ownership Certificate;
5. Water consumption details sheet for non-residential projects (with the stamp of designing institution).

Note: For the installation of small-bore water meters whose bore ≤ 25mm, only materials listed in above-mentioned Item 3, Item 4, and a water usage application (daily water consumption volume must be noted) are required.

Procedures: Users shall bring required materials to the business office and apply for installation.

Time Limit: 18 working days

Expense: Free

Result: Formulation of installation scheme will be complete.

Handling Department: Customer Service Center

Address: Huashui Mansion, No.12, BEIWA Road, Haidian District, Beijing
Postal Code: 100089
Office Hours: 8:00 -- 17: 00 (working days)
Contact Tel: 0086 10 66411734
Online Application: Temporally unavailable, and forms can not be downloaded.
Website: www.bjwatergroup.com.cn

 

 